The 33rd China International Exhibition on Electric Power Equipment and Technology
Shanghai New International Expo Center (Hall N1 - N5, W4 - W5), PR China 2026 • 12 • 3 - 5

GONGXIN ELECTRIC POWER TECHNOLOGY CO., LTD.
W5B63
Add EP Wechat for consultation
Share this page
Exhibitor E-invitation
Invitation / Product Poster
DISTRIBUTION TRANSFORMER
New Products / New Technology
This distribution transformer is designed for 10-35kV distribution networks to supply power directly to end users. Adopting low-loss core structure, S11 and above series reduce no-load loss by 30% compared with traditional S9 products, with operating noise as low as 30-45dB. It supports multiple insulation types like oil-immersed and dry-type, optional off-circuit/on-load voltage regulation modes, and features fully-sealed corrugated tank design. Suitable for pole-mounted, floor-standing and other installation scenarios, it is widely used in urban & rural power grids, industrial and mining enterprises, with excellent energy efficiency and stable operation.
RMU
New Products / New Technology
This eco-friendly gas cabinet uses low-GWP insulating gas to replace traditional SF, with one unit equivalent to reducing over 58 tons of CO emission. It features 40% smaller size than traditional air cabinets, IP67 protection rating, and fully-sealed structure that resists dust and water splash. It supports integrated intelligent monitoring units for remote fault warning, greatly extending the maintenance-free cycle. Suitable for scenarios like power distribution, data centers, mines and new energy stations, it is an ideal choice for low-carbon distribution networks.
COMPACT SUBATATION
New Products / New Technology
This box-type substation is a factory prefabricated compact complete power distribution equipment, integrating high-voltage switch, distribution transformer and low-voltage distribution units, suitable for 10/0.4kV three-phase AC systems. It is moisture-proof, rust-proof, fully enclosed and movable, with optional European, American, landscape and other structures, equipped with intelligent temperature control and fault warning modules. Installation and commissioning only take 5-8 days. Widely applicable to urban & rural grid renovation, new energy stations, industrial & mining enterprises, commercial communities and other scenarios, it covers only 1/5 of the area of traditional civil substations, with stable operation and convenient maintenance.
思源黑体预加载(勿删): GONGXIN ELECTRIC POWER TECHNOLOGY CO., LTD.