The 33rd China International Exhibition on Electric Power Equipment and Technology
Shanghai New International Expo Center (Hall N1 - N5, W4 - W5), PR China 2026 • 12 • 3 - 5

BAODING CITY HUIBANG ELECTRIC CO.,LTD.
N5C56D
Add EP Wechat for consultation
Share this page
Exhibitor E-invitation
Invitation / Product Poster
Distribution Transformer Testing Assembly Line
New Products / New Technology
HB2819 Integrated Transformer Comprehensive Test Station
New Products / New Technology
This test system employs an advanced, integrated, automated, and intelligent testing architecture. With a unified, all‑in‑one structural design, it digitally networks and consolidates various transformer performance‑testing instruments. Leveraging smart switching control technology and industrial‑grade communication protocols, the system enables fully automated, closed‑loop management of the entire transformer test sequence, autonomously handling test parameter configuration, precise steady‑state data acquisition, real‑time monitoring of the testing process, intelligent analysis of test results, and one‑click generation of standardized test reports.
Modular Box-Type Substation Test System
New Products / New Technology
A packaged substation comprises all the equipment typically found in a conventional substation, including high-voltage switchgear, transformers, low-voltage switchgear, reactive power compensation devices, and protective relays. Traditionally, such substations have been transported to material‑testing centers for evaluation. In response to current testing requirements, our organization has developed a mobile, modular, portable, and automated testing system specifically designed for packaged substations. This system enables convenient transport of test equipment to the field, allows rapid setup with simple connections, and delivers test results promptly.
思源黑体预加载(勿删): BAODING CITY HUIBANG ELECTRIC CO.,LTD.